Aljurf Budoor villas

  Sahel Al Emarat, Abu Dhabi

AED 2.9 M

2,3,4,5 & 7 BR

303 - 830 SQM

10/30/60

Sep 2021

Villas

Aljurf Budoor Villas

Aljurf Budoor Villas one of the creations of Imkan, the renowned name in the Middle East presents you a wide range of villas in its centric community location in AlJurf, inspired from the essential elements of the Arabian Desert tent with modular, open and linear. These Villas offers a contemporary design with various floor sizes with 2, 3, 4, 5 & 7 bedroom units provided giving a wide range of opportunity to choose from.

The Whole area is covered with beautiful date palms, muster flowers, peach trees and tamarisk bushes; whereas the slow-paced oasis life captures the contrast between lush and dry desert daydreams. The Villas are being inspired by the topography and landscape with natural oasis embraced with shaded pools, golden sand and layers of vegetations providing a heavenly respite from the harsh heat.

The Residents can access the wide range of opportunity with access to multiple benefits of restaurants and cafes with canal and water views including Qasr Al Jurf, Jiwar Alqasr, wellness clinic and resort, Tidal canal and Jiwar Alqsr public beach.

Key fact

  • Second home Destination
  • World Renowned Wellness Clinic and Resort
  • Fully Integrated community
  • Turtle Sanctuary
  • Abundant Open Spaces
  • Private Beach
  • Private Marina
  • World Class infrastructures

Floor Plan

It provide well spacious floor plan design offering from 2, 3, 4, 5 & 7 bedroom units with various sizes. The Interiors are designed with world-class finishing and specifications with porcelain tiles in the living area, corridor, dining area, lobby and kitchen. It also provides a Master bedroom option to explore more where the residents can enjoy its well-spaced interior and modern design. The Exterior is designed with natural stones, concrete and precast concrete pavers with walkways and exterior facades with lush green garden area and parks. You can also enjoy the beautiful natural view from your balcony and terrace, as well as it provides ample parking spaces to park your vehicle.


Payment Plan

It has an easy and attractive Payment Plan option provided by the developer. It is the best opportunity to invest the money for such beautiful designed homes in the natural sand and beach areas to inspire the residents and visitors. The Buyers can have an option to pay 60% of the total payment over 9 to 13 equal semi-annual instalment.


Till Handover / 20/80 Payment Plan

Installments Date Milestones Payment (%)
First Purchase Date Upon Signing RA/SPA 10%
Second 08 June 2019 Site Clearance Complete 2.5%
Third 08 December 2019 Bulk Earthworks 100% Complete 2.5%
Fourth 08 June 2020 100% Infrastructure Construction Completion 2.5 %
Fifth 08 December 2020 Completion of foundations and ground slab 2.5%
Sixth 08 September 2021 100% Construction Completion 80%

7 Year Payment Plan / 4.5 Year Post Handover

Installments Date Milestones Payment (%)
First Purchase Date Upon Signing RA/SPA 10%
Second 08 June 2019 Site Clearance Complete 5%
Third 08 December 2019 Bulk Earthworks 100% Complete 5%
Fourth 08 June 2020 100% Infrastructure Construction Completion 5 %
Fifth 08 December 2020 Completion of foundations and ground slab 5%
Sixth 08 September 2021 100% Construction Completion 10%
Seventh 08 March 2022 Post Handover Payment 1 6.7%
Eighth 08 September 2022 Post Handover Payment 2 6.7%
Nineth 08 March 2023 Post Handover Payment 3 6.7%
Tenth 08 September 2023 Post Handover Payment 4 6.7%
Eleventh 08 March 2024 Post Handover Payment 5 6.7%
Twelfth 08 September 2024 Post Handover Payment 6 6.7%
Thirteenth 08 March 2025 Post Handover Payment 7 6.7%
Fourteenth 08 September 2025 Post Handover Payment 8 6.7%
Fifteenth 08 March 2026 Post Handover Payment 9 6.7%

9 Year Payment Plan / 6.5 Year Post Handover

Installments Date Milestones Payment (%)
First Purchase Date Upon Signing RA/SPA 10%
Second 08 June 2019 Site Clearance Complete 5%
Third 08 December 2019 Bulk Earthworks 100% Complete 5%
Fourth 08 June 2020 100% Infrastructure Construction Completion 5 %
Fifth 08 December 2020 Completion of foundations and ground slab 5%
Sixth 08 September 2021 100% Construction Completion 10%
Seventh 08 March 2022 Post Handover Payment 1 4.6%
Eighth 08 September 2022 Post Handover Payment 2 4.6%
Nineth 08 March 2023 Post Handover Payment 3 4.6%
Tenth 08 September 2023 Post Handover Payment 4 4.6%
Eleventh 08 March 2024 Post Handover Payment 5 4.6%
Twelfth 08 September 2024 Post Handover Payment 6 4.6%
Thirteenth 08 March 2025 Post Handover Payment 7 4.6%
Fourteenth 08 September 2025 Post Handover Payment 8 4.6%
Fifteenth 08 March 2026 Post Handover Payment 9 4.6%
Sixteenth 08 September 2026 Post Handover Payment 10 4.6%
Seventeenth 08 March 2027 Post Handover Payment 11 4.6%
Eighteenth 08 September 2027 Post Handover Payment 12 4.6%
Nineteenth 08 March 2028 Post Handover Payment 13 4.6%